Pull Testing, London

Aug 23, 2021

Location: 250 City Road, London

Client: Lindner

Project: Pull Testing

At LFT, we provide a range of options to ensure the strength, reliability, and durability of construction fixings are CFA approved. Using the latest calibrated equipment, we can off a fully certified service.

Here is a snapshot from our recent pull test carried out in London using the Hydrajaws Model 2050 Fixing Tester which carries 2 calibrated gauges, covers 0 to 30kN & 0 to 50kN, and has a wide bridge to cover a wider range of applications.